Yangzhou Rongxing Electric Co.,Ltd

High quality product, professional service, being the core supplier in laser industry!

Home > News > Content
Drag Chain Cable General Requirements
- Sep 27, 2017 -

  Drag Chain Cable general requirements:

  1, the laying of the Drag Chain Cable can not be twisted, that is not from the cable reel or cable to unlock the cable at one end, but should first rotate the reel or cable tray to expand the cable, if necessary, the cable can be launched or suspended. The cable used in this case can only be obtained directly from the cable roll.

  2, must pay attention to the minimum bending radius of the cable. The

  3, the cables must be loosely laid side by side in the towline, separated as far as possible, Drag Chain Cable separated by the septum or into the separation of the stent in the separation of holes in the towline between the cable gap should be at least 10% of the cable diameter.

  4, the cable in the towline may not touch each other or trapped together.

  5, the two points of the cable must be fixed, or at least the moving end of the towline must be fixed. Drag Chain Cable The distance from the end of the cable should be 20-30 times the diameter of the cable.

  6, make sure that the cable is fully moved within the bend radius, ie, Drag Chain Cable it can not be forced to move. So that the cables can be moved relative to each other or with the guide. After a period of operation, it is best to check the location of the cable. The check must be made after the push-pull movement.

  7, if the towline break, then the cable also need to be replaced, Drag Chain Cable because the damage caused by excessive stretching can not be avoided.